Welcome to Ingenionics
The Power of Ingenionics
The data model, developed and streamlined on over 50 major projects, can manage a wide range of issues from geographical information to data requirements for project planning, design management, estimating and cost control, risk and change management, document control and project administration. The artificial intelligence provides the audit trail and leads the user through the construction development using a common set of access parameters for all data. It provides transparent, accurate and extremely fast feedback for the user to enable commercial decisions to be made as soon as the latest planning and technical data is entered into the system. Waiting for information either in summary or detail form is a thing of the past. Claims can be defended or submitted in a fraction of the time of conventional systems as the procedures are built into the information structure of the data base. Contract, specification and programme schedule information share the same code structure. INGENIONICS provides the detail for analyzing changes at the touch of a button.
Examples of the power of INGENIONICS:
Stage 1:
Capture of data using advanced 3D laser scanning and terrestrial photogrammetric surveys to produce the tridimensional environment for CAD modeling.
Stage2:
Pre-determined guidance in the development of design through the use of this captured information and user friendly standard drop down menus to assist in evaluating risk scenarios, revisions and preparation of drawings during the planning process up to tender designs and project budgets for the employer.
Stage 3:
Preparation of contractual documents including bills of quantities and schedules, contract conditions and specifications using an in-built quality assurance approach to ISO 9001 as well as allocation of resources for the estimate and tender submissions of contractors.
Stage 4:
Support for construction management including, time line productivity networked programmes and change management to provide instant cash flow analyses dependent on “what if“ situations. Automatic preparation of data for claims management and monitoring of changes.
Stage 5:
Preparation of in-built project controls matrices and integrated data capture via RFID and satellite technology of actual resource usage on site to issue of costs to date using the previously captured data as the basis for comparison.
Stage 6:
Consolidation of information at the touch of a button to produce periodic reports, defects management and audits in preparation of the final as-built information for the commissioning phase and operations manuals.